Large Scale AIDC/IDC Construction

Forging Industry Benchmarks with Robust Technological Strengths and a Profound Cultural Foundation

Power Distribution Cabinet Installation

Install power distribution equipment for data centers, including mains distribution cabinets, UPS input/output cabinets and row-level precision distribution cabinets, which distribute power to downstream equipment.

Construction Standards:
Execution Standard: GB50462-2024 Clause 5.2
Base installation: Floor-mounted cabinets shall be equipped with base frames; the connection between cabinet and base, base and ground shall be fully fixed
Allowable verticality deviation: ±1.5‰
Internal wiring shall be checked against construction drawings; all labels shall be complete and legible

If the weight of battery banks exceeds the floor load limit, floor reinforcement measures must be taken

Contact Us
Our professional service team will contact you as soon as possible
Contact
Wuhan Heyan Technology Co., Ltd.
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan