Home > Application > AIDC Industry > No.5 Building, Zhangjiakou Mingwei Jingxi Cloud Computing Data Center Project
Construction Location:Yuxian Economic Development Zone, ZhangjiakouTotal
Construction Area:43,497.06 ㎡
Rack Quantity: 4,048 racks of 16kW specification, total IT load 60MW
The power supply system adopts 2N redundant architecture, equipped with 60 sets of 1,800kW diesel generator units.Eight compartments on the second floor adopt indirect evaporative cooling units with net sensible cooling capacity of 280kW and 330kW as cooling sources. Meanwhile, 2 sets of heat-recovery prefabricated full-variable frequency fluorine pump integrated air conditioner units (net sensible cooling capacity 300kW, heat recovery capacity 325kW) are configured to recover waste heat for heating.Five modular computer rooms on the first floor adopt air-wall DX air conditioner units; power distribution rooms are equipped with air-cooled precision air conditioners with fluorine pump energy-saving modules.
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan