Construction Location: Chahar Economic & Technological Development Zone, UlanqabTotal
Construction Area: 20,997.82 ㎡
Rack Quantity:2,892 racks of 11kW specification, total IT load 30MW
The power supply system adopts 2N redundant architecture, equipped with 30 sets of 1,800kW diesel generator units.Four compartments on the second floor are equipped with 126 sets of fluorine pump integrated air conditioner units with net sensible cooling capacity of 300kW as cooling sources. In addition, 2 sets of heat-recovery prefabricated full-variable frequency fluorine pump integrated air conditioner units (net sensible cooling capacity 300kW, heat recovery capacity 330kW) are configured to recover waste heat for other heating systems.Four modular computer rooms on the first floor adopt 32 sets of air-wall DX air conditioner units with net sensible cooling capacity of 160kW; power distribution rooms are equipped with air-cooled precision air conditioners with fluorine pump energy-saving modules.
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan