Home > Application > AIDC Industry > Block 1B Data Center, Jingmeng Zero-Carbon Smart Computing Industrial Park
Location: Tuguiwula Town, Qahar Qianqi, Ulanqab
Total Construction Area: 22,341 ㎡
Rack Configuration: Total IT load reaches 36 MW, including 72 racks of 150 kW and 288 racks of 54 kW.
This project is the first large-scale liquid cooling data center developed by Zhonglian Data Group.
The cooling system adopts dry coolers with spray systems and cooling water pumps as the primary cold source. Cooling capacity is generated by dry coolers and transferred to liquid cooling racks via CDUs (Coolant Distribution Units). Dual cold source air wall units provide supplementary cooling for both air-cooled and liquid-cooled racks, with all heat rejection handled by rooftop dry coolers.
The power supply system implements a 2N redundant architecture. 630 A intelligent compact busbars are deployed for terminal power distribution, alongside 27 units of 1,800 kW diesel generator sets for backup power.

Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan