Home > Application > AIDC Industry > Block 1A Data Center, Jingmeng Zero-Carbon Smart Computing Industrial Park
Construction Location: Tuguwula Town, Chayou Front Banner, UlanqabTotal
Construction Area:22,341 ㎡
Rack Quantity: 2,886 racks of 12kW specification, total IT load 30MWThe power
supply system adopts 2N redundant architecture, equipped with 30 sets of 1,800kW diesel generator units.
Eight computer room compartments on the second floor all adopt fluorine pump integrated air conditioners with net sensible cooling capacity of 280kW and 330kW as cooling sources. Meanwhile, heat-recovery prefabricated full-variable frequency fluorine pump air conditioner units with net sensible cooling capacity of 280kW are configured to recover waste heat for heating of other systems.
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272