Case

Block 4 Data Center, Jingmeng Industry-Education Integration Intelligent Computing Demonstration Base

Construction Location:Tuguwula Town, Chayou Front Banner, UlanqabTotal

Construction Area:39,630.49 ㎡

Rack Quantity:4,383 racks, total IT operating power 60MW


The power supply system adopts 2N redundant architecture, including 10kV power distribution engineering, UPS uninterruptible power supply system, power dynamic distribution system, electrical lighting system, emergency lighting system, lightning protection and grounding system. Cooling layout: Indirect evaporative cooling units are used for the first-floor computer rooms; air-cooled precision air conditioners are adopted for the second-floor power distribution area; heat-recovery prefabricated full-variable frequency fluorine pump air conditioner units with net sensible cooling capacity of 300kW are used as cooling sources for the third-floor computer rooms.


Contact Us
Our professional service team will contact you as soon as possible
Contact
Wuhan Heyan Technology Co., Ltd.
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan