Construct supply air ducts, return air ducts, fresh air ducts and smoke exhaust ducts for precision air conditioning in data centers, including plenum chambers, supply air pipes and exhaust pipes.
Construction Standards:
Execution Standard: GB50462-2024 Clause 7.3, GB50243
Cleanliness requirement: The inner surface of air ducts shall be flat and smooth, and must be thoroughly cleaned before installation (free of dust and oil stains) to ensure the cleanliness of the computer room
Reinforcement requirement: Rectangular ducts without insulation with long side length over 630mm, or insulated ducts with long side length over 800mm shall be reinforced
Air tightness requirement: Air-tight and dust-free sealing gaskets shall be installed at flange joints, and the gaskets shall not be damaged during fastening
Insulation construction can only be carried out after air duct tightness inspection is qualified to prevent condensation
。
Landline:027-81329609
Power Industry Hotline:Mr. Zhang +86 15007198081
AIDC Construction Hotline:Mr. Xu +86 15072422900 / Mr. Liu +86 13907185272
No.01,3rd Floor, Block C, Building 6, DangDai International Garden, DongHu Development District, Wuhan